Residential Concrete Seawall Construction
New Concrete Seawall, Belle Meade Island
Belle Meade Island, Miami, FL
A full replacement of 125 feet of seawall at a private residence on Belle Meade Island, finished with a reinforced concrete cap and limestone riprap along the waterline.
- Client
- Private residence
- Location
- Belle Meade Island, Miami, FL
- Project Scope
- Full replacement of 125 feet of seawall with a new engineered concrete wall, finished with a reinforced concrete cap and rock riprap along the waterline.
- Primary Materials
- Precast concrete panels
Prestressed concrete piles
Galvanized steel reinforcement
High-strength fiber-reinforced concrete
Limestone riprap
Project Case Study
From Challenge to Completed Work
The Challenge
A tight island lot with limited working room, strict environmental rules for in-water work, and a design upgrade to a larger, stronger cap partway through construction.
Our Solution
We cast the wall panels right on the property and installed everything from our own crane barge, keeping the water protected throughout. When the design changed, we adapted the formwork and poured the new cap in a single continuous pour.
The Result
A new seawall built to last, completed in about three months and approved by Miami-Dade environmental inspectors on final inspection.
At a Glance
Project Highlights
Completed Work
Project Gallery
Start Your Project
Planning a Waterfront Project?
Tell us about your property and the marine construction work you are considering.