Beach Access Construction
Jensen Beach Walkover
Jensen Beach, Hutchinson Island, Martin County, Florida
Construction of two permanent, ADA-accessible beach access paths at North and South sites on Hutchinson Island as part of Martin County's 2026 beach renourishment.
- Client
- Great Lakes Dredge & Dock (GLDD), for Martin County
- Location
- Jensen Beach, Hutchinson Island, Martin County, Florida
- Project Scope
- Construction of two permanent, ADA-accessible beach access paths at North and South sites as part of Martin County's 2026 beach renourishment.
- Primary Materials
- Approximately 7,900 board feet of #1 pressure-treated lumber, including 95 posts (6x6 and 4x6)
2,520 stainless steel (304) carriage bolts with stainless nuts and washers
Stainless steel (305) deck screws
10 truckloads of graded aggregate for the pathways
Project Case Study
From Challenge to Completed Work
The Challenge
Martin County's beaches between Stuart and Jensen Beach had not been renourished since 2018. During the 2026 project, temporary dune crossovers had to be removed, closing public beach access. The County needed permanent, ADA-accessible paths that could remain in place through future renourishment cycles. Work had to take place within an active dredging site, on a tight schedule, and based on written specifications rather than a full set of plans.
Our Solution
CMC visited the site and delivered a proposal within a week of the request, then had materials on site and a crew mobilized two weeks later. Posts were embedded at least 6 feet into the sand. Every bolt was recessed so no hardware faces beachgoers. The railings follow Martin County Parks standards and the Florida Building Code, with multiple horizontal rails and a continuous top cap. After completing the railings, the paths were graded and finished for accessible use, and pile stops were added at the north entrance.
The Result
Both access points were completed in about six weeks on site and accepted by Martin County in June 2026, two months after the initial request. The permanent paths eliminate the need for the County to remove and rebuild temporary crossovers with each renourishment cycle.
At a Glance
Project Highlights
Completed Work
Project Gallery
Start Your Project
Planning a Waterfront Project?
Tell us about your property and the marine construction work you are considering.